From the 1974 Master Plan – Section 5, pages 78-79 (emphasis added)
Editor’s Note: In my view, 1974 is the last time the Borough put together a well-documented, comprehensive, sensible Master Plan. It was slightly revised in a fairly good 1996 document, but the 2002 document was a pathetic piece of slipshod work, in my opinion.
Since the Borough must review and revise the Master Plan this year by law, there’s a great opportunity for the Planning Board, with community support and assistance, to rectify the enormous deficiencies of the 2002 document by updating the data in the 1974 version and adding in the community’s new ideas for the future.
Master Plan Revision is a duty of the Planning Board; to date, I’ve heard no signals suggesting they’ve got plans to start the required public hearings and do the job. To review all the Master Plans including and since 1974, check out the Document Library and scroll down.
FLOOD CONTROL
Perhaps the most serious problem which North Plainfield has experienced in recent years is frequent flooding of lands adjacent to Stony Brook and Green Brook. The more extensive floods occurred in 1969, 1971 (Hurricane Doria) and 1973. The latter flood proved to be the most serious.
The damage caused by flooding in the Borough has been extensive and has exceeded that experienced by most municipalities in the State. Although there is no way of defining precisely the amount of damage caused by flooding, estimates of damage to private and public property resulting from the 1973 storm alone range from $2,000,000 to $3,000,000. In addition, clean-up and repairs following this storm cost the Borough $400,000.
The flood damage that has occurred in the past is very much the result of the fact that development has taken place in flood plain areas which should have been left undisturbed. In addition, as more area upstream becomes developed, these flood plain areas stand the chance of being expanded. Therefore, prompt action must be taken if the Borough is to avoid repeated flood damage and the resulting expense.
Flooding of Stony Brook and Green Brook is largely a regional problem which is beyond the ability of the Borough alone to solve. Cooperative efforts of other municipalities are needed and, most importantly, action by higher levels of government. To date, activities in this area by County, State and Federal agencies have been tentative and incomplete and no firm or specific solutions have been presented despite the urgency of the problem.
Obviously, immediate actions are necessary if the Borough is to avoid repetition of flood damage.
Historically, solutions to flood problems have largely involved structural improvements, including dams and piping. In all probability, the ultimate correction of flooding of Stony Brook and Green Brook will necessitate drainage and flood control structures ot this nature. In addition, facilities for upstream detention will be desirable and should reduce volume downstream.
However, such measures will be extremely costly and may not provide the complete solution in North Plainfield. The Borough has more improved properties in the floodways than any other municipality in the County and many of these properties may continue to be faced with the threat of flood damage despite structural improvements.
The alternate solution in the Borough and the one which would be most expeditious, would be to acquire properties within flood hazard areas and return them to their natural state. Such an approach could prove to be far less expensive than structural improvements and should increase the water retention capacity of land adjoining the streams.
A number of attempts to define flood hazard areas and to identify properties that have experienced flooding have been made by Federal and State agencies. Review of the results of these efforts reveal apparent discrepancies between the flood delineations and what has been actual, local experience. Therefore, there is a need for more precise information before properties which should be acquired can be identified and reflected for this purpose on the Master Plan.
This will involve further studies which should address themselves to the following:
- (a) Identification of properties which should be acquired either as a result of final structural solutions that may be developed by the Corps of Engineers or out of consideration for safety and protection of life.
- (b) Preparation of a plan for the acquisition of the properties so identified utilizing every available and prudent funding source at the Federal and State government levels.
(c) Establishment of a local, flood hazard area delineation which will serve as the basis for sound and rational land use and development regulations within flood prone areas.